Back to all case studiesTK Maxx secured a new distribution centre in the ‘logistics golden triangle’ in Rugby. DHL had committed to a rapid 20-week programme for fit out which was a challenge in itself.BriefThe installation was to comprise of sprinkler protection at roof level, under the mezzanine floors and within the pallet racking. SolutionA bespoke steel frame was designed by Alpine to support the large diameter distribution pipes adjacent to the manifold. Throughout the project Alpine collaborated with other service providers to ensure that the system was implemented and delivered on time. Where We WorkLogistics & DistributionAerospaceAutomotivePharmaceuticalsFood & BeverageHigh Hazard What We DoSales EstimatingDesign EngineeringProject ManagementPlanned MaintenanceReactive ResponseTraining Suppression SystemGas SuppressionFoam SystemsWater Mist SystemsPre-action SystemsDeluge SystemsDry Pipe SystemsWet Pipe SystemsOur Clients