TK Maxx secured a new distribution centre in the ‘logistics golden triangle’ in Rugby. DHL had committed to a rapid 20-week programme for fit out which was a challenge in itself.

Brief

The installation was to comprise of sprinkler protection at roof level, under the mezzanine floors and within the pallet racking.


Solution

A bespoke steel frame was designed by Alpine to support the large diameter distribution pipes adjacent to the manifold. Throughout the project Alpine collaborated with other service providers to ensure that the system was implemented and delivered on time.