Back to all case studiesHigh-Hazard storage facility, completed in 20-weeks.BriefAlpine were appointed to deliver an end to end fire suppression solution for a major high hazard storage facility. The project required rapid delivery, high volume installation and full compliance, with 38.4 miles of sprinkler pipework completed in 20 weeks. SolutionAlpine Fire delivered one of the UK’s largest industrial sprinkler installations for a high hazard storage facility, completing the full project in just 20 weeks. The system was designed, installed, tested and commissioned to meet strict compliance and insurer requirements while remaining reliable, scalable and built for long term performance Where We WorkLogistics & DistributionAerospaceAutomotivePharmaceuticalsFood & BeverageSpecial Risk Environments What We DoSales EstimatingDesign EngineeringProject ManagementPlanned MaintenanceReactive ResponseTraining Suppression SystemGas SuppressionFoam SystemsWater Mist SystemsPre-action SystemsDeluge SystemsDry Pipe SystemsWet Pipe SystemsOur Clients