Back to all case studies TK Maxx secured a new distribution centre in the ‘logistics golden triangle’ in Rugby. DHL had committed to a rapid 20-week programme for fit out which was a challenge in itself. Brief The installation was to comprise of sprinkler protection at roof level, under the mezzanine floors and within the pallet racking. Solution A bespoke steel frame was designed by Alpine to support the large diameter distribution pipes adjacent to the manifold. Throughout the project Alpine collaborated with other service providers to ensure that the system was implemented and delivered on time. Where We Work Logistics & Distribution Aerospace Automotive Pharmaceuticals Food & Beverage High Hazard What We Do Sales Estimating Design Engineering Project Management Planned Maintenance Reactive Response Training Suppression System Gas Suppression Foam Systems Water Mist Systems Pre-action Systems Deluge Systems Dry Pipe Systems Wet Pipe Systems Our Clients