Back to all case studiesFood production sites are often extremely complex with valuable stainless-steel plant, storage vessels and pipe runs throughout.BriefThe AG Barr project comprised a 230,000 square feet of production area and 130,000 square feet of fully racked warehouse. The intricate mezzanine floors with stainless steel pipe runs required a detailed and accurate design. SolutionThe sprinkler pipework provided across the site is a combination of stainless steel and BS EN 10255 steel. Alpine were also responsible for the installation of a 60 minute rated fire curtain to separate the production ESFR sprinkler system from the conventional roof level sprinkler system. Where We WorkLogistics & DistributionAerospaceAutomotivePharmaceuticalsFood & BeverageHigh Hazard What We DoSales EstimatingDesign EngineeringProject ManagementPlanned MaintenanceReactive ResponseTraining Suppression SystemGas SuppressionFoam SystemsWater Mist SystemsPre-action SystemsDeluge SystemsDry Pipe SystemsWet Pipe SystemsOur Clients