Back to all case studies DHL planned to increase the Logistics Centre at Colnbrook with a new 150,000 square feet extension. The new hub would process millions of packages every year. Brief Rapid response sprinkler protection was required throughout the roof, under mezzanines and needed to integrate within complex conveyor and sorting systems. Solution The Alpine solution was designed to a high level of detail, millimetre perfect, to ensure that all pipework avoided the moving parts of the site automation. In addition consideration was given to the types and sizes of packages to ensure that movement of parcels was not impeded by sprinkler pipework and heads whilst ensuring the system would deliver optimum performance on demand. Where We Work Logistics & Distribution Aerospace Automotive Pharmaceuticals Food & Beverage High Hazard What We Do Sales Estimating Design Engineering Project Management Planned Maintenance Reactive Response Training Suppression System Gas Suppression Foam Systems Water Mist Systems Pre-action Systems Deluge Systems Dry Pipe Systems Wet Pipe Systems Our Clients