Back to all case studiesGlaxosmithkline had invested over £70m to develop an in-house bottle blowing and moulding operation.BriefThe US Insurer - FM Global insisted on a full sprinkler protection system due to the in house capability of the site and the hazardous nature of the stored goods. SolutionThe project was delivered to time and specification. Once installed Glaxosmithkline have continued to implement augmented sprinklers systems and we have continued to develop our on-going service support relationship. Where We WorkLogistics & DistributionAerospaceAutomotivePharmaceuticalsFood & BeverageSpecial Risk Environments What We DoSales EstimatingDesign EngineeringProject ManagementPlanned MaintenanceReactive ResponseTraining Suppression SystemGas SuppressionFoam SystemsWater Mist SystemsPre-action SystemsDeluge SystemsDry Pipe SystemsWet Pipe SystemsOur Clients